Wiki source code of G89: Цикл растачивания с паузой и отводом на рабочей подаче
Last modified by writer on 2022/11/02 19:23
Show last authors
| author | version | line-number | content |
|---|---|---|---|
| 1 | (% style="color:#a0be2d" %)//**G89 (X- Y- Z-) or (U- V- W-) R- L- P-**// | ||
| 2 | |||
| 3 | The (% style="color:#a0be2d" %)**//G89//**(%%) cycle is designed for waste. In this loop, the number P is used, where P is the number of seconds to delay. | ||
| 4 | |||
| 5 | 1. Preparatory movement described in the section [["Canned cycles">>doc:WebHome]] | ||
| 6 | 1. Movement along the Z axis with a given feedrate to the Z position. | ||
| 7 | 1. Delay for P seconds. | ||
| 8 | 1. Moving at the current feedrate to the return height in Z. |